FLEXCONNECT FOR DATA CENTERS
Connect Your Data Center Faster
Accelerate your data center grid connections with flexible interconnections. Skip delays and get online faster by leveraging existing grid capacity.

Grid delays are putting your data center projects on hold
Streamline utility large-load assessments
Collaborate with utilities to assess the grid impacts of large load additions easily and iteratively. Identify the best sites for interconnection faster and with fewer delays.

Balance firm and flexible capacity seamlessly
Enable firm and flexible capacity with 24-hour ahead signaling to your site. Secure reliable power while maintaining operational flexibility to meet your needs.

.png)
Lower costs and carbon emissions
Prioritize grid energy when it’s low-cost and low-carbon, and shift to behind-the-meter generation during grid constraints.
Learn about FlexConnect for Data Centers
A flexible interconnection accelerates the connection process by allowing your data center to access available grid capacity without waiting for costly upgrades. It uses dynamic operating parameters to balance firm capacity (always available) and flexible capacity (available when the grid can handle it), ensuring your data center gets reliable power while minimizing delays and costs.
By deploying sensors, leveraging utility data, and generating dynamic operating envelopes, our solution provides real-time visibility into grid capacity. We use the sensor data plus grid-aware signaling to ensure loading remains within available grid capacity. This approach streamlines utility approvals, eliminates unnecessary delays, and helps fleet operators get their charging infrastructure online 6–18 months faster.
Absolutely. Our solution works well for large loads like data centers with behind-the-meter generation, dynamically managing total site load while balancing for cost and carbon emissions.
Our solution includes sensor deployment to gather real-time grid data, as well as a standardized data exchange with your behind-the-meter energy systems like batteries and generators. Alternatively, the system can use existing utility data like SCADA or AMI, though this may involve longer deployment timelines.
By prioritizing low-cost, low-carbon grid energy and strategically using batteries and generators during grid constraints, our solution helps you meet cost and sustainability goals.
Get started today
Think FlexConnect might be a good fit? We’re happy to answer your questions and show you how flexible interconnection can help your team.